Recent Posts
Recent Comments
Archives
- May 2026
- April 2026
- January 2026
- October 2025
- March 2025
- November 2024
- July 2024
- March 2024
- January 2023
- November 2022
- September 2022
- August 2022
- February 2022
- January 2022
- December 2021
- October 2021
- September 2021
- August 2021
- July 2021
- June 2021
- May 2021
- April 2021
- March 2021
- February 2021
- January 2021
- December 2020
- November 2020
- October 2020
- April 2020
- April 2019
- March 2019
- March 2009
- January 2009
- November 2008
- October 2008
- August 2008
- July 2008
- June 2008
- May 2008
- April 2008
- March 2008
- February 2008
- January 2008
- December 2007
- November 2007
- October 2007
- September 2007
- June 2007
- May 2007
- December 2006
- October 2006
- June 2006
- October 2004
- April 2004
Categories
- Articles
- Camino 2026
- Coca-Cola Campaign
- Coca-Cola Research
- Communities
- Current Affairs
- Cycling
- Dashborads
- Data for Development
- DIY
- Electric Vehicle
- Empowerment
- Fixes
- Framing Error
- Framing Hint
- Garden
- Green Oak Barn
- Homepage
- Ideas
- Innovation
- Interview
- Misc files
- Online services
- Post ColaLife
- Pre-2009
- Rural
- Self-sustaining Development
- Stories
- Sustainability
- Technology
- Transport
- Travel
- Tunes
- Typepad – Beamends
- Uncategorized
Meta
Category Archives: Green Oak Barn
Rear wall featherboard and glazing the front window
February 2022 Two days after fitting the rear wall frames, window and breather paper, the COVID restrictions were lifted and I went skiing in France! When I got back, it was time to fit the featherboard to the outside rear … Continue reading →
Rear wall frames, window and breather paper
January 2022 With Christmas over and winter set in I needed to refocus on progressing the finishing of the barn. At this point the barn looks finished from the front but the back is still open. Although the wind and … Continue reading →
Hanging the sliding doors
October 2021 Since the slates went on the roof of the barn, finishing it has been less of a priority than making things within it (see The Wedding Dining Table Project, Utility Room Elizabethan style – Belfast Sink stand, Utility … Continue reading →
Panel to Left of Door Complete – green oak barn
Tuesday 24/8/21 With the wedding dining table project complete, I was able to get back to working on the barn. Today I put in the featherboards to the left of the door opening. These boards went up very quickly as … Continue reading →
Featherboards Completed for Front Right Bay – green oak barn
Monday 2/8/21 Today the featherboards for the front right bay went up. Once again, because there were braces involved, the top boards needed to be put in place before the boards below them were all fixed. Key posts How … Continue reading →
Featherboards of Left Front Bay Complete – green oak barn
Sunday 1/8/21 After all the faffing around yesterday working out a better position for the featherboard fixings, the rest of the featherboards for this bay went up quite quickly. The image below shows the challenge faced when putting the boards … Continue reading →
Re-think on Featherboard Spacing – green oak barn
Wednesday 28/7/21 Although I was happy with the overall effect of the featherboard fixing I did yesterday, there were one or two niggles. The main one was the spacing of the stainless steel fixings. They look too high. Also, because … Continue reading →
First Featherboard Fixing – green oak barn
Tuesday 27/7/21 Today I started by adding “kick-out” wedges to the bottom the the wall panel frame. This picture was taken after they had been fitted and the breather paper stapled to them. I’ve placed a spare wedge in the … Continue reading →
Framing the Window Frame – green oak barn
Monday 26/7/21 I’ve been wondering for several weeks how best to deal with the window frame to featherboard detail. Finally I came up with this solution: to run a piece of 50 x 50mm green oak down each side of … Continue reading →
First Window Frame Fixed – green oak barn
Saturday 24/7/21 Today I reassembled the large front window after painting and fixed it into the wall panel frame. I started by attaching expanding foam around the edges of the window frame. I then temporarily fixed strips of polythene to … Continue reading →