-
Recent Posts
Recent Comments
Archives
- May 2026
- April 2026
- January 2026
- October 2025
- March 2025
- November 2024
- July 2024
- March 2024
- January 2023
- November 2022
- September 2022
- August 2022
- February 2022
- January 2022
- December 2021
- October 2021
- September 2021
- August 2021
- July 2021
- June 2021
- May 2021
- April 2021
- March 2021
- February 2021
- January 2021
- December 2020
- November 2020
- October 2020
- April 2020
- April 2019
- March 2019
- March 2009
- January 2009
- November 2008
- October 2008
- August 2008
- July 2008
- June 2008
- May 2008
- April 2008
- March 2008
- February 2008
- January 2008
- December 2007
- November 2007
- October 2007
- September 2007
- June 2007
- May 2007
- December 2006
- October 2006
- June 2006
- October 2004
- April 2004
Categories
- Articles
- Camino 2026
- Coca-Cola Campaign
- Coca-Cola Research
- Communities
- Current Affairs
- Cycling
- Dashborads
- Data for Development
- DIY
- Electric Vehicle
- Empowerment
- Fixes
- Framing Error
- Framing Hint
- Garden
- Green Oak Barn
- Homepage
- Ideas
- Innovation
- Interview
- Misc files
- Online services
- Post ColaLife
- Pre-2009
- Rural
- Self-sustaining Development
- Stories
- Sustainability
- Technology
- Transport
- Travel
- Tunes
- Typepad – Beamends
- Uncategorized
Meta
Monthly Archives: July 2021
Re-think on Featherboard Spacing – green oak barn
Wednesday 28/7/21 Although I was happy with the overall effect of the featherboard fixing I did yesterday, there were one or two niggles. The main one was the spacing of the stainless steel fixings. They look too high. Also, because … Continue reading →
First Featherboard Fixing – green oak barn
Tuesday 27/7/21 Today I started by adding “kick-out” wedges to the bottom the the wall panel frame. This picture was taken after they had been fitted and the breather paper stapled to them. I’ve placed a spare wedge in the … Continue reading →
Framing the Window Frame – green oak barn
Monday 26/7/21 I’ve been wondering for several weeks how best to deal with the window frame to featherboard detail. Finally I came up with this solution: to run a piece of 50 x 50mm green oak down each side of … Continue reading →
First Window Frame Fixed – green oak barn
Saturday 24/7/21 Today I reassembled the large front window after painting and fixed it into the wall panel frame. I started by attaching expanding foam around the edges of the window frame. I then temporarily fixed strips of polythene to … Continue reading →
Painting Window Frames – green oak barn
Tuesday 20/7/21 I’ve spent a couple of hours each day over the last few days painting windows. I decided to use OSMO for this. This is a bit of an experiment. I want to see how it goes and if … Continue reading →
Mezzanine Floor Complete – green oak barn
Saturday 10/7/21 Yesterday I went to Chandlers to see if they had chipboard flooring. The current materials shortage meant they haven’t had any for many weeks. However, nine boards had just arrived and I needed nine to put the floor … Continue reading →
Flower press in oak
Made at Emma’s request for Kate’s Hen Do.
Lorry Straps Removed – green oak barn
Wednesday 7/7/21 Today I decided to bite the bullet and remove the lorry strap holding down the wall sill. I started by tightening the four fixings. I was worried that they wouldn’t be sufficiently fixed as, on one of them, … Continue reading →
Filling the Gap Between the Wall and Wall Sill: Part 2 – green oak barn
Sunday 4/7/21 Today I grabbed a couple of hours between family commitments to fill the gap between the wall and the wall sill from the inside of the building. I’d already filled this gap from the outside a couple of … Continue reading →
Filling the Gap Between the Wall and Wall Sill: Part 1 – green oak barn
Friday 2/7/21 A job that’s been hanging around for a while is the filling in of the gap between the wall sill and the top of the wall. Regular readers will know that this sill had quite a bow in … Continue reading →