Featherboards of Left Front Bay Complete – green oak barn

Sunday 1/8/21

After all the faffing around yesterday working out a better position for the featherboard fixings, the rest of the featherboards for this bay went up quite quickly.

Left front bay featherboards in place

The image below shows the challenge faced when putting the boards up behind braces. The top boards need to be slotted in before the ones below them are fixed. They are then brought down to their correct position before being fixed.

Dealing with the boards behind the braces

Key posts

How it started
The plan
The site folder
Dealing with wonky timber
Moving into the third dimension
Raising the Barn
Putting up the softwood roof
Fixing the wall panel frames: Day 1
Roof complete

This entry was posted in DIY, Green Oak Barn. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *