Tuesday 27/7/21

Today I started by adding “kick-out” wedges to the bottom the the wall panel frame. This picture was taken after they had been fitted and the breather paper stapled to them. I’ve placed a spare wedge in the picture to show what they look like.

Kick out wedge

Then I fitted the first featherboards and was pretty pleased with the overall effect.

First panel section nearly complete - 1

There is still some work at the top of this panel which I will do tomorrow.

Here’s some of the detail: the featherboard kick-out and abutment to the 50 x 50mm green oak (left) and the featherboards sitting behind the wall brace (right).

First panel section nearly complete - 2 First panel section nearly complete - 3

Key posts

How it started
The plan
The site folder
Dealing with wonky timber
Moving into the third dimension
Raising the Barn
Putting up the softwood roof
Fixing the wall panel frames: Day 1
Roof complete

 

 

This entry was posted in DIY, Green Oak Barn. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *