-
Recent Posts
Recent Comments
Archives
- May 2026
- April 2026
- January 2026
- October 2025
- March 2025
- November 2024
- July 2024
- March 2024
- January 2023
- November 2022
- September 2022
- August 2022
- February 2022
- January 2022
- December 2021
- October 2021
- September 2021
- August 2021
- July 2021
- June 2021
- May 2021
- April 2021
- March 2021
- February 2021
- January 2021
- December 2020
- November 2020
- October 2020
- April 2020
- April 2019
- March 2019
- March 2009
- January 2009
- November 2008
- October 2008
- August 2008
- July 2008
- June 2008
- May 2008
- April 2008
- March 2008
- February 2008
- January 2008
- December 2007
- November 2007
- October 2007
- September 2007
- June 2007
- May 2007
- December 2006
- October 2006
- June 2006
- October 2004
- April 2004
Categories
- Articles
- Camino 2026
- Coca-Cola Campaign
- Coca-Cola Research
- Communities
- Current Affairs
- Cycling
- Dashborads
- Data for Development
- DIY
- Electric Vehicle
- Empowerment
- Fixes
- Framing Error
- Framing Hint
- Garden
- Green Oak Barn
- Homepage
- Ideas
- Innovation
- Interview
- Misc files
- Online services
- Post ColaLife
- Pre-2009
- Rural
- Self-sustaining Development
- Stories
- Sustainability
- Technology
- Transport
- Travel
- Tunes
- Typepad – Beamends
- Uncategorized
Meta
Monthly Archives: December 2020
Last Post Mortice and Tenon – green oak barn
Thursday 31/12/20 I only did half a day today but progress was made all the same. I started by cutting the tenon on the last post. A time to remember that it’s not just where you cut that’s important but … Continue reading →
Progress Review – green oak barn
Wednesday 30/12/20 It was a cold start. I went out, took this picture and came straight back inside for a cup of coffee! Shortly afterwards I was able to square off the end of this last post and mark out … Continue reading →
The Last Leg – green oak barn
Tuesday 29/12/20 Ha ha! That should read “the last post”. We are certainly not on the last leg of this project. Having said that, the pile of timber that has had stuff done to it is now bigger than the … Continue reading →
Brace Position – green oak barn
Monday 28/12/20 It’s cold out there so while I wait a bit for the frost to melt I thought I’d talk about the thinking that has gone into the position of the braces. In the original drawings all the braces … Continue reading →
Setback – green oak barn
Sunday 27/12/20 I had intended to get back to the project this morning after the Christmas break but Storm Bella hit us last night and destroyed our work area. This is a real setback and will slow things up considerably. … Continue reading →
Bits and pieces – green oak barn
Monday 21/12/20 It was a lousy day today – overcast and wet – so I didn’t get to those brace tenons as predicted yesterday. There were also other demands on my time. But I did get two small things done. … Continue reading →
Front Short Post – green oak barn
Sunday 20/12/20 Today started with the levelling up of the front short post, designating and face side and face edge and drawing centre lines. I then marked out the haunched tenon that joins this post to the wall plate. Taking … Continue reading →
Near Perfection Achieved – green oak barn
Friday 18/12/20 This is Ben as he prepares to go off-piste. In our quest for perfection on these front brace joints we’d already decided to try a different technique. We started the day by drilling and pinning the lower brace … Continue reading →
Four Brace Tenons and Two Brace Mortices – green oak barn
Thursday 17/12/20 Good progress today due in part to all the preparation – marking out specifically – done yesterday. I also had a couple of short visits from Ben which was confidence booster. The first achievement was the cutting of … Continue reading →
Posts Pegged and Braces Cut – green oak barn
Tuesday and Wednesday 15/12/20 and 16/12/20 Two part days of slow but steady progress. Steps forward, no steps back. Tuesday started with the drilling of the peg holes for the posts and these were pinned. Slight adjustments were made to … Continue reading →