Phase 1 Electrics Go In – green oak barn

Wednesday 9/6/21

Today the first phase of the electrics went in. As I mentioned earlier, the plan was to move the existing set up to the new location. The existing set-up had been installed with over-long cables with this in mind.

Temporary consumer unit board Fireboard installed

But instead a completely new system was installed.

New consumer unit

I was very unimpressed and cross about this. On a planet with limited resources this action has caused the manufacture of components that will now be completely redundant.

But anyway, I now have basic electrics in the barn and I will build on this in the next phase once I’ve decided where I want power points and lights.

Key posts

How it started
The plan
The site folder
Dealing with wonky timber
Moving into the third dimension
Raising the Barn
Putting up the softwood roof
Fixing the wall panel frames: Day 1

 

 

 

This entry was posted in DIY, Green Oak Barn. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *